Respond to and repair the Wyndham Street main break
You are a network maintenance operator on the Reyes crew.
What has happened
A priority 1 break on the 150 millimetre cast iron main in Wyndham Street has been logged by the control centre with water across the road and 38 properties likely to lose supply. The crew arrives to find water flowing from a circumferential crack, a bus stop and a cafe within the exclusion area, and the utility plans showing a telecommunications conduit and a gas main nearby. The excavation will be about 1.7 metres deep. The main will be open for several hours and there is a sewer in the same street. The Networks Manager expects the procedure to be followed step by step and the records completed before the crew leaves site.
Deliverables
- Pre-excavation controls checklist
- Updated work order with isolation, repair and return to service records
- Excavation permit in the register, issued and closed
- Water Quality Sampling Register entry
Documents to use
Systems to use
Network Work Orders
Tracks every reactive and planned job on the water and sewer networks, plants, storages and channels from dispatch to completion.
Permit to Work Register
Records every confined space entry, excavation, hot work and isolation permit with the permit holder, controls, gas readings and close-out.
Water Quality Sampling Register
Records operational and verification samples, laboratory results and the result status for drinking water, recycled water, effluent and raw water.
Units of competency
Current on training.gov.au for the National Water Training Package as at 10 September 2026.
NWPNET051Monitor and operate water distribution systemsNWPNET029Locate, identify and protect utilitiesNWPNET019Prepare and restore worksiteNWPNET018Disinfect network assetsNWPGEN023Use maps, plans, drawings and detailsQualifications
NWP20122Certificate II in Water Industry OperationsNWP30222Certificate III in Water Industry OperationsWhat to look for
Evidence guide
Check that the student reports to the control centre before isolating, keeps the isolation to the smallest area, locates and potholes services before machine excavation and raises the permit before the trench exceeds 1.5 metres. The disinfection and sampling steps must follow the procedure, with the reason for the bacteriological sample stated. Records across the work order, permit and sampling register must be consistent.