Inspect a sewer by camera and plan a confined space entry
You are a network maintenance operator preparing to lead your first confined space entry.
What has happened
Work order WO-26-4428 covers a camera inspection of 300 metres of 150 millimetre vitrified clay sewer in Kialla township between manhole S-1102 and S-1106, where repeated blockages suggest root intrusion. The camera gets 110 metres from S-1102 before a root mass stops it. The Crew Leader has decided that the roots must be cut from the downstream manhole and that an entry to S-1104 will be needed to set the cutter and recover a stuck camera skid. The manhole is 3.2 metres deep on a road verge. Jordan Reyes wants you to prepare the entry permit as a draft for review, with every control specified, and to record the camera findings.
Deliverables
- Camera inspection record on the work order with coded defects
- Entry avoidance assessment
- Completed Confined Space Entry Permit at Draft in the register
- Note to the Crew Leader listing the controls to be verified
Documents to use
Systems to use
Network Work Orders
Tracks every reactive and planned job on the water and sewer networks, plants, storages and channels from dispatch to completion.
Permit to Work Register
Records every confined space entry, excavation, hot work and isolation permit with the permit holder, controls, gas readings and close-out.
Units of competency
Current on training.gov.au for the National Water Training Package as at 10 September 2026.
NWPNET037Inspect sewer or stormwater assetsNWPNET063Use digital imaging equipment in the fieldNWPNET040Maintain and repair network assets for wastewaterNWPGEN017Apply the risk management principles of the water industry standards, guidelines and legislationQualifications
NWP30222Certificate III in Water Industry OperationsWhat to look for
Evidence guide
The student must show that entry is the last option after remote methods are considered. The permit must specify gas limits that match the procedure, a ventilation and retest step, a standby person who never enters, a retrieval-based rescue plan and flow isolation. Look for the camera record to be coded and located by chainage. The permit must be left at Draft, not issued, by the student.